| Code | Fracturing_Efficiency |
| Name | Frac Job Efficiency |
| Parents | Property > Efficiency |
| Description | Ratio of Fracture Volume at end of job to Total Volume Pumped. The difference between the two volumes represents the volume which leaked off into the formation. |